Scaffold & Bracing Systems
MCS Scaffolding System – Patent No. AU2010101120
Our Systems
MCS have developed specialised internal scaffolding and bracing systems, specifically designed for use in wastewater pump stations, access chambers and other similar structures.
Our systems are of a modular design to make installation easier and to ensure access through smaller openings. They are built in a range of sizes to suit various diameters.
Some of our scaffold systems have a built in adjustable bracing system that can be used to stabilise the rigid PVC lining during grout pours in the refurbishment process of wet wells.
Job Safe Award
In 1997 MCS was the recipient of a prestigious “Job Safe Award” (from the then Department of Occupational Health & Safety) for its original scaffolding system. The system has since been modified to suit other applications and still remains in continual use within our operations.
Check out our gallery of Scaffolding & Bracing Systems...
Swipe left or right to view the gallery.